Concrete

Concrete Steps Calculator

Enter your step size and how many steps lead up to the landing. You get the concrete volume, bag counts and a check against the usual code limits for risers, treads and the landing.

  • Tested formulas
  • Feet or metric
  • Printable shopping list

1 Your measurements

Type feet and inches the way you'd write them, like 12' 6" or 30 3/8. Decimals work too.

in
Code maximum is 7¾". 6–7½" is comfortable.
in
Code minimum is 10".
ft
in
At least 36" in front of an exterior door. Enter 0 for no landing.
%

2 What to buy

Updates as you type
Concrete needed
1.66 yd³
44.9 cu ft incl. waste
80 lb bags
75
or 100 × 60 lb
Ready-mix order
1.75 yd³
rounded up to ¼ yard
  • ✓ Riser 7" ≤ 7.75" IRC maximum
  • ✓ Tread 11" ≥ 10" IRC minimum
  • ✓ Landing 36" ≥ 36" deep at an exterior door
  • ✓ Width 48" ≥ 36" IRC minimum
Steps (treads)3
Risers4
Height at the top28"
Total run (front to back)69"
Volume before waste40.83 cu ft
40 lb bag150 bags
60 lb bag100 bags
80 lb bag75 bags

Shopping list

Quick answer

Three 7-inch steps with 11-inch treads, 4 ft wide, up to a 36-inch-deep landing need 1.66 cubic yards of concrete with 10% extra: 75 bags of 80 lb mix. Each step's volume is width × tread depth × its height from the ground, and the landing is width × depth × the full height.

Concrete for common step sizes

Steps3 ft wide, no landing4 ft wide, no landing4 ft wide + 36" landing5 ft wide + 48" landing
1 step0.07 yd³ · 3 bags0.09 yd³ · 4 bags0.66 yd³ · 30 bags1.06 yd³ · 48 bags
2 steps0.20 yd³ · 9 bags0.26 yd³ · 12 bags1.12 yd³ · 51 bags1.75 yd³ · 79 bags
3 steps0.39 yd³ · 18 bags0.52 yd³ · 24 bags1.66 yd³ · 75 bags2.55 yd³ · 115 bags
4 steps0.65 yd³ · 30 bags0.87 yd³ · 40 bags2.30 yd³ · 104 bags3.47 yd³ · 156 bags
5 steps0.98 yd³ · 45 bags1.31 yd³ · 59 bags3.02 yd³ · 136 bags4.49 yd³ · 202 bags

7" risers, 11" treads, 10% extra. Bags are 80 lb. Use the calculator above for your exact size.

How the steps calculation works

Poured steps on the ground are a staircase of solid blocks. The bottom step is one riser tall, the next is two risers tall, and so on. The calculator adds up each step as width × tread depth × its height, then adds the landing as width × landing depth × the full height to the door.

Worked example: three steps up to a door

  • Steps 4 ft wide, 7" risers, 11" treads, 36" landing
  • Steps: 11" deep at 7", 14" and 21" tall; landing: 36" deep at 28" tall
  • Volume: (11 × 7 + 11 × 14 + 11 × 21 + 36 × 28) × 48 ÷ 1,728 = 40.8 cu ft
  • With 10%: 1.66 yd³, or 75 bags of 80 lb mix

The landing is often more than half the concrete. That's normal, and it's why tall stoops are usually poured from a ready-mix truck.

Code limits for steps

ItemIRC limit
Riser height7¾" maximum, all risers equal within ⅜"
Tread depth10" minimum
Width36" minimum
Landing at an exterior doorAt least 36" deep in the direction of travel
HandrailRequired with 4 or more risers

Most US towns use the International Residential Code (IRC) for these limits, sometimes with local changes. Check with your building department, especially for frost-depth footings under the landing.

Ways to use less concrete

  • Fill the core. On tall steps, builders often fill the inside of the forms with compacted gravel or broken concrete and pour a shell around it. Ask your building department what they allow.
  • Pour on a compacted base. A few inches of compacted gravel under the steps helps drainage and stops settling.
  • Leave a gap at the house. An expansion joint strip between the landing and the foundation lets each move on its own.

Frequently asked questions

How many bags of concrete do I need for 3 steps?

For three 7" steps with 11" treads, 4 ft wide and no landing, about 24 bags of 80 lb mix. Add a 36" landing and it rises to 75 bags.

How thick should concrete steps be?

Solid steps are as thick as each step is tall. If you build with a gravel core, the shell is commonly 4 to 6 inches thick with rebar, but follow your local code and any engineer's plans for tall stoops.

Should concrete steps have rebar?

Rebar or wire mesh helps hold cracks together and is common practice, especially in the landing. Some local codes also require dowels into the house foundation.

Last reviewed 2026-10-23. See how we calculate for our sources and assumptions.

Add this calculator to your website

Free for blogs, contractors and DIY sites. Paste this where you want the calculator to appear. It resizes itself and works on phones.

Please keep the credit line. The calculator updates automatically when we improve it. Preview the widget.